Customization: | Available |
---|---|
After-sales Service: | 2 |
Warranty: | 2 |
Still deciding? Get samples of US$ 1/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
We have three kinds of PVC pipe , including PVC drainage, water supply and electric conduit pipe. The main major export markets is Southeast Asia, South America, Africa and other places.
Specification |
3/8"-4" D20-400mm |
Packing |
5.8m or customized |
Raw Material |
PVC-U,CPVC |
Standard: |
1.ASTM D-1785, ASTM D-2241, ASTM D2665 2.BS4514/5255 3.AS/NZ 1260 Standard 4. DIN,GB/T |
Application |
Water Supply, Drainage |
Technics |
Injection |
Color |
white, grey, yellow or customized |
Working temperature |
PVC: -15°-55°,CPVC-20°-110° |
OEM service |
We're factory ,OEM service is welcome |
Packaging Details:Standard export packing.
Shijiazhuang Shentong Plastic Industry Co.Ltd was established in 2003, which is a enterprise concentrating manufacturing and sales. Specialized in new plastic piping.
1.Are you manufacturer or trade company?
We are a professional manufacture, we will provide you with top-class service.
2. What's the order process?
a.Inquiry--- The more detailed information you provide, the more accurate product we could provide you.
b. Quotation---Resonable quotation with clear specifications.
c. Sample confirmation---Sample could be sent before the final ordering.
d. T/T 30% in advanced, and the balance could be paid before shipment.
e. Production---Mass production.
f. Shipping--- By sea, air or courier. Detailed picture of package could be provided.
3. How long is your delivery time?
Generally it is 7-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
4. How does your factory do regarding quality control?
"Quality is priority." We always attach great importance to quality controlling from the beginning to the end.
5.Can I get a discount?
A:We will be glad to give you a discount if your order is big enough.